Skip to main content

Public contracts of Saint-Jean-le-Blanc · 2026 · Construction and buildings

Marché global de performance pour la reconstruction du centre de loisirs

€2.4M
maximum contract amount over 3 years — what was paid on it is not published
Signed on 7 January 2026 · running until about December 2028 · 3 yrs
Ongoing7 Dec 2028

That is at most ~€836k a year on average: a maximum too.

Company selected

Entreprise Blot FilsTravaux de démolition · registered office Vennecy (45760) · headcount 20 to 49 employees · SIREN 328825161

A contract awarded to a consortium of 5 holders; above, the main holder. With it: Slvi, ALP Architecture, Madera, Ingénierie Diagnostics Études Structures (Ides). The amount is the whole contract’s: the DECP does not publish each holder’s share.

The competition

6 bids received

Median for this procedure in 2026: 3 bids, across 23502 comparable contracts. Simplified procedure · awarded to 5 companies

Open data gives the contract holder and the number of bids. The identity of unsuccessful bidders is not published.

The largest of the 24 contracts Saint-Jean-le-Blanc published for 2026.

Other contracts of Entreprise Blot Fils in Saint-Jean-le-Blanc

Terrassement voirie et réseaux divers démolition2026 · maximum over 5 months89€kTravaux de construction d’un terrain de tennis couvert2026 · maximum over 5 months74€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 8

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.