Supplier of Saint-Julien-de-Concelles · Construction and buildings
Alfao
Alfao holds one public contract awarded by Saint-Julien-de-Concelles in 2025. That is 1% of the value of the contracts the town awarded in 2025.
head office in Saint-Julien-De-Concelles (44) · 10 to 19 employees · Fabrication de portes et fenêtres en métal · SIREN 442692554
€10k
at most, over the whole term of the contracts awarded by Saint-Julien-de-Concelles in 2025
Its contracts in Saint-Julien-de-Concelles
Maximum amount of each contract, over its whole term: not what was paid.
Travaux de réhabilitation d’un local commercial situé 38 place de…Menuiseries exterieures · 2025 · maximum over 6 months · Simplified procedure€10k