Skip to main content

Public contracts of Saint-Laurent-du-Maroni · 2023 · Construction and buildings

Aménagement de l’école temporaire Giffard : achat et installation de structures légères

€3.2M
maximum contract amount over 4 months — what was paid on it is not published
Signed on 5 May 2023 · ended around September 2023 · 4 months

Company selected

Guyane Structure Modulaire IndutrielleFabrication de structures métalliques et de parties de structures · registered office Kourou (97310) · headcount 6 to 9 employees · SIREN 802714576

Number 3 by amount of the 81 contracts Saint-Laurent-du-Maroni published for 2023. It belongs to the policy Schools.

Other contracts of Guyane Structure Modulaire Indutrielle in Saint-Laurent-du-Maroni

Achat et installation de structures légères2023 · maximum over 4 months3.3€MAchat et installation de structures modulaires…2020 · maximum over 2 months29€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.