Supplier of Saint-Martin-sur-Oust · Construction and buildings
Ets Navarro
Ets Navarro holds 2 public contracts awarded by Saint-Martin-sur-Oust in 2025. That is 23% of the value of the contracts the town awarded in 2025.
head office in Ambon (56) · 10 to 19 employees · Travaux d'installation d'eau et de gaz en tous locaux · SIREN 451740211
€45k
at most, over the whole term of the contracts awarded by Saint-Martin-sur-Oust in 2025
Its contracts in Saint-Martin-sur-Oust
Maximum amount of each contract, over its whole term: not what was paid.
Travaux de rénovation d’un ensemble bâtimentaire situé rue de…VMC · ECS · 2025 · maximum over 16 months · at most ~€22k a year on average · Simplified procedure€30kTravaux de rénovation d’un ensemble bâtimentaire situé rue de…Plomberie · 2025 · maximum over 16 months · at most ~€12k a year on average · Simplified procedure€16k