Skip to main content

Public contracts of Saint-Maur-des-Fossés · 2020 · Other

2020 MOD-Installation d’une structure provisoire à l’école élémentaire des Tilleuls

€79k
maximum contract amount over 4 years — what was paid on it is not published
Signed on 3 July 2020 · ended around July 2024 · 4 yrs

That is at most ~€20k a year on average: a maximum too.

Company selected

Pref'AubConstruction d'autres bâtiments · registered office Villechetif (10410) · headcount 20 to 49 employees · SIREN 662880509

Number 54 by amount of the 137 contracts Saint-Maur-des-Fossés published for 2020.

Other contracts of Pref'Aub in Saint-Maur-des-Fossés

Location d’une construction modulaire pour l’école élémentaire des…2025 · maximum over 4 years120€kSG SS PUB Rajout modulaires-Rajout en superposition…2023 · maximum over 2.5 years67€kSg Mapa 31052021-Installation et location d’un ensemble de…2021 · maximum over 4 years99€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.