Public contracts of Saint-Michel-sur-Orge · 2020 · Construction and buildings

Travaux de construction d’un accueil de loisirs sans hébergement (ALSH) pour le groupe scolaire Jules Ferry

€27k
maximum contract amount over 18 months — what was paid on it is not published
Signed on 4 March 2020 · ended around September 2021 · 18 months

That is at most ~€18k a year on average: a maximum too.

Company selected

SterrenAutres travaux d'installation n.c.a. · registered office Marolles-En-Hurepoix (91630) · headcount 10 to 19 employees · SIREN 434257788

Number 26 by amount of the 29 contracts Saint-Michel-sur-Orge published for 2020. It belongs to the policy Schools.

Other contracts of Sterren in Saint-Michel-sur-Orge

Travaux de construction d’un accueil de loisirs sans hébergement (ALSH)…2020 · maximum over 18 months26€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : 2

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.