Public contracts of Saint-Nazaire · 2024 · Construction and buildings

École jules simon

Travaux de réhabilitation de la maternelle existante et construction d’un nouveau restaurant scolaire

€320k
maximum contract amount over 2.5 years — what was paid on it is not published
Signed on 11 January 2024 · ended around June 2026 · 2.5 yrs

That is at most ~€132k a year on average: a maximum too.

Company selected

Artbat SystemTravaux de plâtrerie · registered office Treillieres (44119) · headcount 20 to 49 employees · SIREN 394907463

A contract awarded to 2 holders; above, the main holder. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 74 by amount of the 171 contracts Saint-Nazaire published for 2024. It belongs to the policy Schools.

Other contracts of Artbat System in Saint-Nazaire

Travaux de restructuration et réhabilitation2024 · maximum over 2.5 years1.1€MRéhabilitation extension-conservatoire a rayonnement départemental (CRD)2021 · maximum over 3.5 years718€k
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Forfaitaire

Published amendments : 6

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.