Skip to main content

Public contracts of Saint-Nazaire · 2020 · Construction and buildings

Trx restructuration

Halles de MEAN

€325k
maximum contract amount over 2 years — what was paid on it is not published
Signed on 27 November 2020 · ended around December 2022 · 2 yrs

That is at most ~€156k a year on average: a maximum too.

Company selected

Soprema EntreprisesTravaux d'étanchéification · registered office Strasbourg (67100) · headcount 2,000 to 4,999 employees · SIREN 485197552

Number 61 by amount of the 157 contracts Saint-Nazaire published for 2020. It belongs to the policy Economy and trade.

Other contracts of Soprema Entreprises in Saint-Nazaire

Travaux réhabilition pôle animation seniors2025 · maximum over 12 months61€kMulti accueil gs brossolette travaux étanchéité couverture2022 · maximum over 2.5 years594€kRéfection toiture gymnase bouletterie2020 · maximum over 3 months133€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : 3

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.