Skip to main content

Public contracts of Saint-Paul · 2021 · Construction and buildings

Aménagement chemin de la vallée

€2.4M
maximum contract amount over 1 month — what was paid on it is not published
Signed on 2 June 2021 · ended around July 2021 · 1 month

Company selected

Bureau d'Études Techniques Conception et Realisation (Betcr)Travaux de terrassement courants et travaux préparatoires · registered office Saint-Paul (97422) · headcount 20 to 49 employees · SIREN 802809343

Number 11 by amount of the 241 contracts Saint-Paul published for 2021.

Other contracts of Bureau d'Études Techniques Conception et Realisation (Betcr) in Saint-Paul

Reconstruction école primaire grand fond2023 · maximum over 5 years1.2€MReconstruction école primaire grand fond2023 · maximum over 5 years204€kTravaux reconstruction école primaire grand fond2023 · maximum over 5 years64€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : 1

The 2 lots : 1.3 €M · 1.1 €M

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.