Skip to main content

Public contracts of Saint-Paul-Trois-Châteaux · 2024 · Construction and buildings

Travaux de rénovation et extension du musée d’archéologie Tricastine

Suite à déclaration pour insuffisance de budget disponible, le · Est relancé

€90k
maximum contract amount over 14 months — what was paid on it is not published
Signed on 12 December 2024 · ended around February 2026 · 14 months

That is at most ~€77k a year on average: a maximum too.

Who won it

SARL P.P.S.Travaux d'installation électrique dans tous locaux · registered office Bollene (84500) · headcount 20 to 49 employees · SIREN 444894943

The competition

3 bids received

Median for this procedure in 2024: 3 bids, across 48385 comparable contracts. Simplified procedure · awarded to 1 company

Open data publishes the winner and the bid count — never the identity of unsuccessful bidders.

Number 22 by amount of the 64 contracts Saint-Paul-Trois-Châteaux published for 2024. It belongs to the policy Culture, sport and youth.

Other contracts of SARL P.P.S. in Saint-Paul-Trois-Châteaux

Travaux maison de santé pluriprofessionnelle2024 · maximum over 9 months112€kRéfection de l’éclairage de la Cathédrale2024 · maximum over 1 month12€kTravaux de réfection du rdc immeuble n°19 cours des platanes2024 · maximum over 2 months6€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 2

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.