Public contracts of Saint-Pierre · 2022 · Construction and buildings

Avenant n° 1 : mise en accessibilité du centre administratif de terre sainte

Tout corps d’état

€4k
maximum contract amount over 2 years — what was paid on it is not published
Signed on 3 November 2022 · ended around December 2024 · 2 yrs

That is at most ~€2k a year on average: a maximum too.

Company selected

BATINOV.RETravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Saint-Louis (97421) · headcount 20 to 49 employees · SIREN 830125746

Number 99 by amount of the 100 contracts Saint-Pierre published for 2022.

Other contracts of BATINOV.RE in Saint-Pierre

Travaux de mise en accessibilité ERP du case de Pierrefonds2025 · maximum over 2 years67€kCréation d’un local primeur a la ravine des cabris2024 · maximum over 20 months117€kConstruction d’un local d’accueil et sanitaire PMR…2023 · maximum over 12 months52€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.