Skip to main content

Public contracts of Saint-Pierre · 2020 · Construction and buildings

Création d’une salle polyvalente à l’école Célimène

€52k
maximum contract amount over 20 months — what was paid on it is not published
Signed on 2 June 2020 · ended around February 2022 · 20 months

That is at most ~€31k a year on average: a maximum too.

Company selected

Société de Travaux et d'Aménagement Urbain Cadet (EURL Stauc)Travaux de terrassement courants et travaux préparatoires · registered office Saint-Joseph (97480) · SIREN 801411232

Number 121 by amount of the 176 contracts Saint-Pierre published for 2020.

Other contracts of Société de Travaux et d'Aménagement Urbain Cadet (EURL Stauc) in Saint-Pierre

Structuration du terrain beach a la ravine blanche2021 · maximum over 2 years380€kRénovation de la place rotary2020 · maximum over 20 months373€kAménagement d’une aire betonnee sur la parcelle communale ek01692020 · maximum over 1 month28€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.