SBR Construction
SBR Construction holds 2 public contracts awarded by Saint-Rémy-l'Honoré in 2024. That is 33% of the value of the contracts the town awarded in 2024.
head office in Chilly-Mazarin (91) · 20 to 49 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 519871735
Its contracts in Saint-Rémy-l'Honoré
Maximum amount of each contract, over its whole term: not what was paid.
Gros œuvre, voirie et réseaux divers, carrelage2024 · maximum over 4 months · Simplified procedure€390kLot no 04-Revêtement de façades2024 · maximum over 13 months · at most ~€98k a year on average · Simplified procedure€107kElsewhere in France
SBR Construction holds contracts in 2 towns, worth €934k at award.