Supplier of Saint-Saturnin-de-Lenne · Construction and buildings
Construction Pouget
Construction Pouget holds one public contract awarded by Saint-Saturnin-de-Lenne in 2025. That is 57% of the value of the contracts the town awarded in 2025.
head office in Banassac-Canilhac (48) · 20 to 49 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 410666192
Its contracts in Saint-Saturnin-de-Lenne
Maximum amount of each contract, over its whole term: not what was paid.
Réhabilitation de deux maisons en logements locatifs2025 · maximum over 15 months · at most ~€221k a year on average · Simplified procedure€276kElsewhere in France
Construction Pouget holds contracts in 3 towns, worth €2.1M at award.