Supplier of Saint-Sauveur · Construction and buildings
Chaudronnerie Design
Chaudronnerie Design holds 2 public contracts awarded by Saint-Sauveur between 2022 and 2023. That is 8% of the value of the contracts the town awarded over the period.
head office in Saint-Sauveur (38) · 1 or 2 employees · Mécanique industrielle · SIREN 532179173
€93k
of contracts awarded by Saint-Sauveur since 2022
What Chaudronnerie Design does in Saint-Sauveur
Plan école lot 5 chaudronnerie design2023 · 12 months · Simplified procedure€46kPlan école lot 5 chaudronnerie design2022 · 12 months · Simplified procedure€46kRegions, départements, intercommunalities
Chaudronnerie Design holds contracts awarded by one of these bodies, worth €128k.