Skip to main content

Public contracts of Saint-Sébastien-sur-Loire · 2026 · Construction and buildings

Travaux de rénovation et de mise en accessibilité de l’hôtel de ville

Démolition · Maçonnerie

€20k
maximum contract amount over 2 months — what was paid on it is not published
Signed on 9 October 2026 · running until about December 2026 · 2 months
Ongoing9 Dec 2026

Company selected

Boisseau BâtimentTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Mauges-Sur-Loire (49110) · headcount 100 to 199 employees · SIREN 389791112

The competition

1 bid received

Median for this procedure in 2026: 3 bids, across 23525 comparable contracts. Simplified procedure · awarded to 1 company

Open data gives the contract holder and the number of bids. The identity of unsuccessful bidders is not published.

Number 26 by amount of the 30 contracts Saint-Sébastien-sur-Loire published for 2026. It belongs to the policy Administration and shared services.

Other contracts of Boisseau Bâtiment in Saint-Sébastien-sur-Loire

Restructuration et extension du centre socio-culturel de l’Allée verte…2025 · maximum over 21 months272€kTravaux accessibilité2022 · maximum over 4 months18€kConstruction de locaux de stockage associatifs2020 · maximum over 10 months89€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : none

Subcontracting declared : no

Environmental considerations : Critère environnemental, Clause environnementale

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.