Public contracts of Saint-Sébastien-sur-Loire · 2025 · Construction and buildings

Travaux de restructuration et extension du centre socio-culturel de l’Alle verte

Saint-Sébastien-sur-Loire: · Électricité

€135k
maximum contract amount over 21 months — what was paid on it is not published
Signed on 11 July 2025 · running until about April 2027 · 21 months
Ongoing11 Apr 2027

That is at most ~€77k a year on average: a maximum too.

Company selected

Loirat et SauvagetTravaux d'installation électrique dans tous locaux · registered office Rocheserviere (85620) · headcount 6 to 9 employees · SIREN 492561808

The competition

5 bids received

Median for this procedure in 2025: 3 bids, across 49692 comparable contracts. Simplified procedure · awarded to 1 company

Open data gives the contract holder and the number of bids. The identity of unsuccessful bidders is not published.

Number 16 by amount of the 88 contracts Saint-Sébastien-sur-Loire published for 2025. It belongs to the policy Culture, sport and youth.

Other contracts of Loirat et Sauvaget in Saint-Sébastien-sur-Loire

Travaux d’extension de l’école maternelle du centre – électricité…2025 · maximum over 1 month23€kTravaux pour la création de deux ascenseurs à l’école élémentaire de la…2025 · maximum over 7 months14€kTravaux de réfection et de réaménagement des locaux du club de rugby2023 · maximum over 9 months16€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : none

Subcontracting declared : yes

Environmental considerations : Critère environnemental, Clause environnementale

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.