Skip to main content

Public contracts of Saint-Symphorien-d'Ozon · 2018 · Construction and buildings

Construction d’une structure Métallo Textile

€27k
maximum contract amount over 6 months — what was paid on it is not published
Signed on 12 December 2018 · ended around June 2019 · 6 months

Company selected

Beaufrere TPTravaux de terrassement courants et travaux préparatoires · registered office Saint-Symphorien-D'Ozon (69360) · headcount 10 to 19 employees · SIREN 300527082

Number 4 by amount of the 4 contracts Saint-Symphorien-d'Ozon published for 2018.

Other contracts of Beaufrere TP in Saint-Symphorien-d'Ozon

Extension du groupe scolaire des Marais : terrassements, voirie…2024 · maximum over 16 months464€kExtension du groupe scolaire des marais2024 · maximum over 16 months15€kDomaine Dupoizat en pôle socioculturel : terrassements, voirie…2019 · maximum over 16 months320€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.