Supplier of Saint-Urbain · Construction and buildings
Fiel
Fiel holds one public contract awarded by Saint-Urbain in 2020. That is 2% of the value of the contracts the town awarded in 2020.
head office in Bourg-Blanc (29) · Travaux de peinture et vitrerie · SIREN 399177708
€9k
at most, over the whole term of the contracts awarded by Saint-Urbain in 2020
Its contracts in Saint-Urbain
Maximum amount of each contract, over its whole term: not what was paid.
Travaux de rénovation et d’extension des vestiaires de footballPeintures et nettoyage final · 2020 · maximum over 7 months€9kElsewhere in France
Fiel holds contracts in 3 towns, worth €102k at award.