Supplier of Sainte-Foy-lès-Lyon · Construction and buildings
Rey
Rey holds one public contract awarded by Sainte-Foy-lès-Lyon in 2025. That is 8% of the value of the contracts the town awarded in 2025.
head office in Saint-Etienne (42) · Travaux d'installation d'eau et de gaz en tous locaux · SIREN 106517394
Its contracts in Sainte-Foy-lès-Lyon
Maximum amount of each contract, over its whole term: not what was paid.
Travaux de construction du pôle sportifChauffage, ventilation, climatisation plomberie · 2025 · maximum over 17 months · at most ~€398k a year on average · Simplified procedure€565kElsewhere in France
Rey holds contracts in 2 towns, worth €753k at award.