Skip to main content

Public contracts of Sainte-Suzanne · 2020 · Construction and buildings

Constructo d’1 structure modulaire stade de foot bocage

€126k
maximum contract amount over 20 months — what was paid on it is not published
Signed on 15 October 2020 · ended around June 2022 · 20 months

That is at most ~€76k a year on average: a maximum too.

Company selected

Société Maconnerie Bâtiment Ocean IndienTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office La Plaine des Palmistes (97431) · headcount 1 or 2 employees · SIREN 512935230

Number 63 by amount of the 164 contracts Sainte-Suzanne published for 2020.

Other contracts of Société Maconnerie Bâtiment Ocean Indien in Sainte-Suzanne

Gros Œuvre et divers2020 · maximum over 4 months111€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.