Skip to main content

Public contracts of Salazie · 2023 · Construction and buildings

Travaux de rénovation et de sécurisation des écoles

École mare a citrons

€278k
maximum contract amount over 6 months — what was paid on it is not published
Signed on 15 February 2023 · ended around August 2023 · 6 months

Company selected

Pause TerrassementTravaux de terrassement courants et travaux préparatoires · registered office Salazie (97433) · headcount 6 to 9 employees · SIREN 823637301

Number 16 by amount of the 42 contracts Salazie published for 2023. It belongs to the policy Schools.

Other contracts of Pause Terrassement in Salazie

Réhabilitation de la case Hell-Bourg2024 · maximum over 10 months484€kRéhabilitation du CASE de Hell-Bourg2024 · maximum over 10 months366€kConstruction d’une salle polyvalente2024 · maximum over 1 month285€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.