Skip to main content

Public contracts of Sartrouville · 2022 · Construction and buildings

Construction d’un groupe scolaire à Sartrouville

€1.7M
maximum contract amount over 20 months — what was paid on it is not published
Signed on 5 May 2022 · ended around January 2024 · 20 months

That is at most ~€1M a year on average: a maximum too.

Company selected

Roger Renard EntrepriseTravaux d'installation d'équipements thermiques et de climatisation · registered office Perpignan (66000) · headcount 20 to 49 employees · SIREN 301863163

Number 13 by amount of the 59 contracts Sartrouville published for 2022. It belongs to the policy Schools.

Other contracts of Roger Renard Entreprise in Sartrouville

Travaux de construction d’un groupe scolaire à Sartrouville2025 · maximum over 20 months1.6€MTravaux groupe scolaire2025 · maximum over 20 months1.6€MLot n° 11 : Plomberie / Équipements sanitaires / Chauffage / VMC2022 · maximum over 20 months1.7€M
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Révisable

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.