Skip to main content

Public contracts of Sartrouville · 2022 · Construction and buildings

Travaux de construction d’un groupe scolaire à Sartrouville

Revêtement extérieur · Pierre

€1.8M
maximum contract amount over 20 months — what was paid on it is not published
Signed on 5 May 2022 · ended around January 2024 · 20 months

That is at most ~€1.1M a year on average: a maximum too.

Company selected

Soc Nouvelle Régionale du BâtimentConstruction d'autres bâtiments · registered office Ermont (95120) · headcount 50 to 99 employees · SIREN 379882194

Number 11 by amount of the 60 contracts Sartrouville published for 2022. It belongs to the policy Schools.

Other contracts of Soc Nouvelle Régionale du Bâtiment in Sartrouville

Construction d’un groupe scolaire à Sartrouville2022 · maximum over 20 months4.2€MTerrassement, fondations, gros œuvre et charpente métallique2022 · maximum over 20 months4.2€MRevêtement extérieur Pierre –2022 · maximum over 20 months1.8€M
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.