Communauté de communes Maremne Adour Côte Sud · Landes · Nouvelle-Aquitaine · 4,014 residents · Mayor: Pierre Pecastaings
Seignosse
€18.2 million spent in 2025.
€4,537 per resident · Towns of the same size: €1,360
Seignosse’s spending by policy area
Click a line to see what it pays for
The 6 other items (5%)
Source: the town’s 2025 accounts (DGFiP), by public policy.
Where the money goes
The €18.2M spent in 2025, by who receives it.
Source: the town’s 2025 accounts (DGFiP).
Contracts state a maximum amount for their whole term, often several years. That amount differs from what was paid. Purchases, services and works paid to companies by the town in 2025: €11.5M (its accounts).
Click a name to see its contracts
- Castillon TP2 contracts over 5 months to 6 months · 2 with other holdersup to €1.4M
- Idverde (Landes-Adour)3 contracts over 6 months to 10 months · at most ~€1.1M a year on averageup to €1.1M
- Entreprise Soubestre1 contract over 6 monthsup to €1M
- Bever1 contract over 5 months · at most ~€817k a year on averageup to €817k
- Eiffage Route Sud Ouest2 contracts over 5 months to 10 monthsup to €619k
- Enerlis (Davai Energy)1 contract over 2 years · at most ~€149k a year on averageup to €298k
- Sogea Sud Ouest Hydraulique1 contract over 6 months · contract with other holdersup to €284k
31 contracts signed in 2025 · €6.9M before tax · All contracts
Why this total differs from the €11.5M of purchases, services and works paid to companies
These are the amounts of the contracts signed in the year, over their whole length, not what was paid. The money paid in a year also goes to older contracts and to purchases too small to be published (under €40,000 excl. VAT). For a framework agreement, the amount is a ceiling.
Investment and works
€9.6M of capital spending in 2025 (building, renovation, equipment), €2,396 per resident. Towns of the same size: €358.
Click a building site to see the contract
- Démolition, gros œuvre et maçonnerie2024 · Tison & Gaillet€1M
- Travaux rue Jean Moulin : voirie et réseaux divers2025 · Streets and transport · Castillon TP€908k
- Aménagement Jean Moulin et parking des Estagnots : espace vert2025 · Streets and transport · Bever€817k
- Construction de deux padels tennis couverts Le projet consiste dans la construction de deux terrains de padel tennis couverts sur la parcelle 42, section AB de la commune de Seignosse2025 · 6 contracts€411k
- Travaux aménagement bourdaines phase 2 secteur Lette2025 · Eiffage Route Sud Ouest€312k
Largest works contracted since 2023, among published contracts. Amounts planned at signature, often spread over several years.
In addition, €630k given to other bodies for their own equipment (joint funding, energy syndicate…).
Source: the town’s 2025 accounts (DGFiP), by public policy.
Revenue and financing
Revenue: €13M · spending: €18.2M.
Source: the town’s 2025 accounts (DGFiP).
Debt and taxation
€1,264 of local taxes per resident
Towns of the same size: €494
Property tax rate: 28.63%
These taxes are also paid by owners who do not live in the town (second homes, businesses), who are not counted in its population.
Accounts 2025, main budget (excluding annex budgets such as water), except debt and savings: main and annex budgets together (OFGL consolidated accounts). Per resident: amount divided by the total population (Insee, in force in the year of the accounts). Sources: DGFiP, OFGL. “Towns of the same size”: median of the 1,021 towns of 3,500 to 5,000 inhabitants.
Who spends for the residents of Seignosse
Spending per resident in 2025 of each public body the town belongs to, and what each one pays for.
- TownSeignossePrimary schools, canteens, local streets, civil registry€4,537 per resident
- IntercommunalityCommunauté de communes Maremne Adour Côte SudWaste, water, urban transport, economic development€867 per resident
- DépartementLandesMinimum income, elderly and disability care, middle schools, county roads€1,269 per resident
- RegionNouvelle-AquitaineHigh schools, regional trains, training, business support€519 per resident
Each amount is what the body spends per resident, from its accounts (DGFiP). Do not add them up: part of the money passes from one body to another.
Understanding these figures
Running costs and works: what is the difference?
Running costs are each year’s spending: wages, energy, upkeep, grants. Works create or renovate something that lasts: a school, a road, a sports hall.
How is the comparison with towns of the same size made?
The towns of 3,500 to 5,000 inhabitants are ranked from lowest to highest value; the median is the value in the middle. A value above or below the median is not a judgement: it depends on the area, the population and the powers held by the intercommunality.
Where do these figures come from?
From the town’s accounts kept by the public accountant (DGFiP), the local finance observatory (OFGL) and public procurement data. Qipu changes no amount.
Elected officials and staff of Seignosse: to report a figure to correct or add context, write to Qipu.
Compare with Peyrehorade or with another town:
Page published by Qipu, independent of the town · Sources and method
DGFiP balance-sheet accounts (nature axis) · OFGL (consolidated towns base) · Public procurement — DECP (data.gouv.fr) · National register of elected officials, archived versions 2020-2025 · 2025. The method · See the source