Skip to main content

Public contracts of Septèmes-les-Vallons · 2020 · Construction and buildings

Mise en conformité accessibilité de l’école élémentaire Langevin-Wallon

€168k
maximum contract amount over 2 months — what was paid on it is not published
Signed on 15 July 2020 · ended around September 2020 · 2 months

Company selected

Provence Maconnerie GénéraleTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Septemes-Les-Vallons (13240) · headcount 10 to 19 employees · SIREN 513375121

Number 2 by amount of the 6 contracts Septèmes-les-Vallons published for 2020.

Other contracts of Provence Maconnerie Générale in Septèmes-les-Vallons

Rénovation site restauration tg/jp local déchets…2026 · maximum over 4 months123€kRénovation du système de restauration de la crèche La ronde…2025 · maximum over 4 months248€kRéhabilitation école maternelle jacques prévert2025 · maximum over 3 months45€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.