Skip to main content

Public contracts of Sèvremoine · 2020 · Construction and buildings

Rénovation et extension du centre technique est : gros œuvre et dallage

€249k
maximum contract amount over 17 months — what was paid on it is not published
Signed on 17 December 2020 · ended around May 2022 · 17 months

That is at most ~€176k a year on average: a maximum too.

Company selected

Goineau Rousseau ConstructionTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Cholet (49300) · headcount 6 to 9 employees · SIREN 480469477

Number 3 by amount of the 40 contracts Sèvremoine published for 2020. It belongs to the policy Administration and shared services.

Other contracts of Goineau Rousseau Construction in Sèvremoine

Rénovation du centre social de la commune déléguée de saint andré de la…2021 · maximum over 8 months65€kTravaux de rénovation d’une halte ferroviaire2020 · maximum over 7 months94€kTravaux de restructuration et d’extension de la mairie déléguée du…2019 · maximum over 11 months195€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.