Public contracts of Sèvremoine · 2020 · Construction and buildings

Rénovation et extension du centre technique est sur la commune déléguée de st andré de la marche

Charpente métallique

€105k
maximum contract amount over 17 months — what was paid on it is not published
Signed on 17 December 2020 · ended around May 2022 · 17 months

That is at most ~€74k a year on average: a maximum too.

Company selected

TeopolitubFabrication de structures métalliques et de parties de structures · registered office Beaupreau-En-Mauges (49110) · headcount 20 to 49 employees · SIREN 333337590

Number 11 by amount of the 40 contracts Sèvremoine published for 2020. It belongs to the policy Administration and shared services.

Other contracts of Teopolitub in Sèvremoine

Travaux de construction d’une maison de santé pluridisciplinaire2022 · maximum over 18 months105€kTravaux de construction d’une médiathèque et de six logements…2022 · maximum over 16 months28€kConstruction d’une cellule commerciale dans la zac des bottiers…2021 · maximum over 12 months76€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.