Public contracts of Seytroux · 2019 · Professional services
Maîtrise d’oeuvre pour l’extension de l’école de Seytroux
That is at most ~€26k a year on average: a maximum too.
Who won it
Études de Structures et de Beton ArmeIngénierie, études techniques · registered office Thonon-Les-Bains (74200) · headcount 6 to 9 employees · SIREN 320840523A contract awarded to 4 holders; above, the main holder. With it: B.E.T Berger, Martial Gaillard Économie Construcrion, Atelier Delerce Architectures. The amount is the whole contract’s: the DECP does not publish each holder’s share.
Number 7 by amount of the 15 contracts Seytroux published for 2019.
Contract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Ferme et actualisable
Published amendments : none
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.