Supplier of Soisy-sous-Montmorency · Construction and buildings
Erbi
Erbi holds 2 public contracts awarded by Soisy-sous-Montmorency in 2024. That is 1% of the value of the contracts the town awarded in 2024.
head office in Villeneuve-Saint-Georges (94) · 1 or 2 employees · Travaux d'isolation · SIREN 907829709
€145k
at most, over the whole term of the contracts awarded by Soisy-sous-Montmorency in 2024
Its contracts in Soisy-sous-Montmorency
Maximum amount of each contract, over its whole term: not what was paid.
Tx réhabilitation pmPlâtrerie · Fx plafonds · Menuiseries · 2024 · maximum over 12 months · Simplified procedure€72kTravaux de réhabilitation de locaux dans le cadre du transfert de la…Plâtrerie · Faux plafonds · Menuiseries · 2024 · maximum over 3 months · Simplified procedure€72k