Supplier of Solignac · Construction and buildings
Lajarthe
Lajarthe holds one public contract awarded by Solignac in 2025. That is 30% of the value of the contracts the town awarded in 2025.
head office in Boulazac Isle Manoire (24) · 20 to 49 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 917461279
Its contracts in Solignac
Maximum amount of each contract, over its whole term: not what was paid.
Gros œuvre2025 · maximum over 15 months · at most ~€465k a year on average · Open tender€581kElsewhere in France
Lajarthe holds contracts in 3 towns, worth €2.4M at award.