Public contracts of Souillac · 2020 · Professional services
Maîtrise d’oeuvre pour travaux de réhabilitation et création de réseaux d’assainissement, d’adduction d’eau potable et pluvial
That is at most ~€23k a year on average: a maximum too.
Company selected
AltereoIngénierie, études techniques · registered office Venelles (13770) · headcount 100 to 199 employees · SIREN 453686966Number 2 by amount of the 2 contracts Souillac published for 2020.
Other contracts of Altereo in Souillac
Elaboration de la cartographie des réseaux Eau Potable et Assainissement2021 · maximum over 12 months38€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Ferme et actualisable
Published amendments : none
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.