Public contracts of Souleuvre en Bocage · 2023 · Construction and buildings

Réhabilitation et extension de la salle des fêtes de le tourneur

Gros oeuvre voirie et réseaux divers

€96k
maximum contract amount over 19 months — what was paid on it is not published
Signed on 19 September 2023 · ended around April 2025 · 19 months

That is at most ~€61k a year on average: a maximum too.

Company selected

Entreprise Bruno MazzeriTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Conde-Sur-Vire (50420) · headcount 6 to 9 employees · SIREN 342257110

Number 3 by amount of the 16 contracts Souleuvre en Bocage published for 2023. It belongs to the policy Culture, sport and youth.

Other contracts of Entreprise Bruno Mazzeri in Souleuvre en Bocage

Réhabilitation et extension de la salle des fêtes de Le Tourneur2023 · maximum over 10 months83€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Unitaire

Published amendments : 7

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.