Skip to main content

Public contracts of Souleuvre en Bocage · 2026 · Construction and buildings

Réhabilitation énergétique et fonctionnelle du Centre de Loisirs

Peinture intérieure Revêtements sols souples

€90k
maximum contract amount over 16 months — what was paid on it is not published
Signed on 30 September 2026 · running until about January 2028 · 16 months
Ongoing30 Jan 2028

That is at most ~€68k a year on average: a maximum too.

Company selected

SAS PierreTravaux de peinture et vitrerie · registered office Carpiquet (14650) · headcount 20 to 49 employees · SIREN 313977134

The competition

8 bids received

Median for this procedure in 2026: 3 bids, across 23525 comparable contracts. Simplified procedure · awarded to 1 company

Open data gives the contract holder and the number of bids. The identity of unsuccessful bidders is not published.

Number 10 by amount of the 16 contracts Souleuvre en Bocage published for 2026.

Other contracts of SAS Pierre in Souleuvre en Bocage

Réhabilitation et extension de la salle des fêtes de Le Tourneur2023 · maximum over 10 months26€kRéhabilitation énergétique du gymnase du collège Val de Souleuvre2019 · maximum over 7 months16€kAgrandissement de l’école de Campeaux2019 · maximum over 8 months13€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : none

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.