
Eurométropole de Strasbourg · Bas-Rhin · Grand Est · 294,564 residents · Mayor: Catherine Trautmann
Strasbourg
€587.2 million spent in 2025.
€1,993 per resident · Towns of the same size: €1,861
Strasbourg’s spending by policy area
Click a line to see what it pays for
The 4 other items (4%)
Source: the town’s 2025 accounts (DGFiP), by public policy.
Where the money goes
The €587.2M spent in 2025, by who receives it.
Source: the town’s 2025 accounts (DGFiP).
Contracts state a maximum amount for their whole term, often several years. That amount differs from what was paid. Purchases, services and works paid to companies by the town in 2025: €437.2M (its accounts).
Click a name to see its contracts
- Stationnement sur Voirie1 contract over 15 years · at most ~€8M a year on averageup to €119.7M
- Entreprise de Travaux Publics et Prives Georges Durmeyer1 contract over 6 years · at most ~€3M a year on averageup to €17.8M
- Concepteurs Batisseurs Assembleurs5 contracts over 12 months to 4 years · at most ~€2.6M a year on averageup to €8.5M
- Sib Études Structure Ingenierie Bâtiment5 contracts over 2 to 7 years · at most ~€1.1M a year on averageup to €6.8M
- Ernest Jantzi3 contracts over 12 months to 4 years · at most ~€1.3M a year on averageup to €5.1M
- SCOP Espaces Verts2 contracts over 12 months to 6 years · at most ~€884k a year on averageup to €4.7M
- Stenger Platres & Staff6 contracts over 2 months to 4 years · at most ~€1.7M a year on averageup to €4.6M
604 contracts signed in 2025 · €274.2M before tax · 35 contracts (€91.2M) left out of the total: copied or out-of-scale ceilings, duplicate publications · All contracts
Why this total differs from the €437.2M of purchases, services and works paid to companies
These are the amounts of the contracts signed in the year, over their whole length, not what was paid. The money paid in a year also goes to older contracts and to purchases too small to be published (under €40,000 excl. VAT). For a framework agreement, the amount is a ceiling.
Investment and works
€107.8M of capital spending in 2025 (building, renovation, equipment), €366 per resident. Towns of the same size: €340.
Click a building site to see the contract
- Aménagement des espaces publics du projet Archipel 22025 · 2 contracts€22.4M
- Travaux de réhabilitation du Foyer St Joseph2025 · Health and social care · 10 contracts€6.6M
- Aménagement d’une Maison de Service Aux Publics (MSAP)2025 · Streets and transport · 15 contracts€5.9M
- Marché global de performance : rénovation énergétique de deux gymnases2025 · Culture, sport and youth · Sib Études Structure Ingenierie Bâtiment€5.8M
- Réalisation de travaux de rénovation du 5 Place du Château à Strasbourg2025 · Town planning and housing · 15 contracts€4.7M
Largest works contracted since 2023, among published contracts. Amounts planned at signature, often spread over several years.
In addition, €15.2M given to other bodies for their own equipment (joint funding, energy syndicate…).
Source: the town’s 2025 accounts (DGFiP), by public policy.
Revenue and financing
Revenue: €492.2M · borrowing: €75.1M · spending: €587.2M.
Source: the town’s 2025 accounts (DGFiP).
Debt and taxation
Accounts 2025, main budget (excluding annex budgets such as water), except debt and savings: main and annex budgets together (OFGL consolidated accounts). Per resident: amount divided by the total population (Insee, in force in the year of the accounts). Sources: DGFiP, OFGL. “Towns of the same size”: median of the 41 towns of 100,000 inhabitants and over.
Who spends for the residents of Strasbourg
Spending per resident in 2025 of each public body the town belongs to, and what each one pays for.
- TownStrasbourgPrimary schools, canteens, local streets, civil registry€1,993 per resident
- IntercommunalityEurométropole de StrasbourgWaste, water, urban transport, economic development€1,957 per resident
- DépartementAlsaceMinimum income, elderly and disability care, middle schools, county roads€1,054 per resident
- RegionGrand EstHigh schools, regional trains, training, business support€743 per resident
Each amount is what the body spends per resident, from its accounts (DGFiP). Do not add them up: part of the money passes from one body to another.
Understanding these figures
Running costs and works: what is the difference?
Running costs are each year’s spending: wages, energy, upkeep, grants. Works create or renovate something that lasts: a school, a road, a sports hall.
How is the comparison with towns of the same size made?
The towns of 100,000 inhabitants and over are ranked from lowest to highest value; the median is the value in the middle. A value above or below the median is not a judgement: it depends on the area, the population and the powers held by the intercommunality.
Where do these figures come from?
From the town’s accounts kept by the public accountant (DGFiP), the local finance observatory (OFGL) and public procurement data. Qipu changes no amount.
Elected officials and staff of Strasbourg: to report a figure to correct or add context, write to Qipu.
Compare with Haguenau or with another town:
Page published by Qipu, independent of the town · Sources and method
DGFiP balance-sheet accounts (nature axis) · OFGL (consolidated towns base) · Public procurement — DECP (data.gouv.fr) · National register of elected officials, archived versions 2020-2025 · 2025. The method · See the source