Skip to main content

Public contracts of Terre-de-Bancalié · 2025 · Professional services

Maîtrise d’œuvre : construction d’un groupe scolaire et d’un centre de loisirs

€591k
maximum contract amount over 3 years — what was paid on it is not published
Signed on 5 June 2025 · running until about August 2028 · 3 yrs
Ongoing5 Aug 2028

That is at most ~€187k a year on average: a maximum too.

Company selected

Omnium Tech Étude Const Équip Midi PYRIngénierie, études techniques · registered office Toulouse (31000) · headcount 20 to 49 employees · SIREN 451221733

A contract awarded to 6 holders; above, the main holder. With it: Société David Sist, Otce Infra, Harter Architecture, EURL d'Architecture Murzeau Renaud. The amount is the whole contract’s: the DECP does not publish each holder’s share.

The largest of the 2 contracts Terre-de-Bancalié published for 2025.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 1

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.