Skip to main content

Public contracts of Thonon-les-Bains · 2023 · Construction and buildings

Charpente, couverture

€798k
maximum contract amount over 14 months — what was paid on it is not published
Signed on 28 November 2023 · ended around January 2025 · 14 months

That is at most ~€684k a year on average: a maximum too.

Company selected

BourgeoisTravaux de couverture par éléments · registered office Miribel (01700) · headcount 50 to 99 employees · SIREN 332987858

A contract awarded to a consortium of 2 holders; above, the main holder. With it: Campenon Bernard Dauphine Savoie. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 16 by amount of the 95 contracts Thonon-les-Bains published for 2023.

Other contracts of Bourgeois in Thonon-les-Bains

Ancien Casino2023 · maximum over 18 months798€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 2

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.