Skip to main content

Public contracts of Thonon-les-Bains · 2024 · Construction and buildings

Fontainerie

€1.2M
maximum contract amount over 2 years — what was paid on it is not published
Signed on 17 June 2024 · ended around June 2026 · 2 yrs

That is at most ~€618k a year on average: a maximum too.

Company selected

Etude Construction Metal et Bois (Etude Construction Metal et Bois (Ecmb))Fabrication de structures métalliques et de parties de structures · registered office Saint-Malo (35400) · headcount 20 to 49 employees · SIREN 353282619

A contract awarded to a consortium of 4 holders; above, the main holder. With it: Campenon Bernard Dauphine Savoie (Giletto), Terideal Segex Énergies (Setralec - Ad Pompes - Aquagreen). The amount is the whole contract’s: the DECP does not publish each holder’s share.

The competition

1 bid received

Median for this procedure in 2024: 3 bids, across 17968 comparable contracts. Open tender · awarded to 4 companies

Open data gives the contract holder and the number of bids. The identity of unsuccessful bidders is not published.

Number 20 by amount of the 165 contracts Thonon-les-Bains published for 2024.

Other contracts of Etude Construction Metal et Bois (Etude Construction Metal et Bois (Ecmb)) in Thonon-les-Bains

Génie civil et ouvrages métalliques2024 · maximum over 2 years2.1€MRéhabilitation paysagère des talus sous les belvédères : génie civil…2024 · maximum over 2 years2.1€MRéhabilitation paysagère des talus sous les belvédères2024 · maximum over 2 years1.2€M
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Forfaitaire

Published amendments : 15

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.