Skip to main content

Public contracts of Thonon-les-Bains · 2021 · Construction and buildings

Square du Tribunal : fourniture, installation et maintenance d’une sanisette

€53k
maximum contract amount over 7 years — what was paid on it is not published
Signed on 31 August 2021 · running until about August 2028 · 7 yrs
Ongoing31 Aug 2028

That is at most ~€8k a year on average: a maximum too.

Company selected

MPS Toilettes AutomatiquesFabrication de structures métalliques et de parties de structures · registered office Josse (40230) · headcount 50 to 99 employees · SIREN 389030594

Number 48 by amount of the 68 contracts Thonon-les-Bains published for 2021.

Other contracts of MPS Toilettes Automatiques in Thonon-les-Bains

Fourniture, mise en place et maintenance d’un sanitaire public…2024 · maximum over 5.5 years55€kFourniture, mise en place et maintenance d’un sanitaire public…2024 · maximum over 3 months55€kMaintenance de sanitaires publics automatiques du 16/01/2023 au…2022 · maximum over 6 years113€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.