Skip to main content

Public contracts of Thonon-les-Bains · 2022 · Construction and buildings

Travaux Mensuiseries Patio hotel de ville-Travaux de remplacement des menuiseries bois sur les façades du patio de l’hôtel de ville

€60k
maximum contract amount over 2 months — what was paid on it is not published
Signed on 19 April 2022 · ended around June 2022 · 2 months

Company selected

Desuzinge Raymond et Fils SARLTravaux de menuiserie bois et PVC · registered office Thonon-Les-Bains (74200) · headcount 3 to 5 employees · SIREN 320840515

Number 55 by amount of the 95 contracts Thonon-les-Bains published for 2022. It belongs to the policy Administration and shared services.

Other contracts of Desuzinge Raymond et Fils SARL in Thonon-les-Bains

Menuiseries intérieures bois2024 · maximum over 23 months264€kTravaux de réorganisation des locaux de l’hôtel de ville2024 · maximum over 19 months237€kTravaux de réorganisation des locaux de l’hôtel de ville2024 · maximum over 19 months227€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.