Supplier of Thorigny · Construction and buildings
Lift Face
Lift Face holds 2 public contracts awarded by Thorigny in 2024. That is 8% of the value of the contracts the town awarded in 2024.
head office in Montaigu-Vendee (85) · 10 to 19 employees · Travaux de peinture et vitrerie · SIREN 348405598
€91k
at most, over the whole term of the contracts awarded by Thorigny in 2024
Its contracts in Thorigny
Maximum amount of each contract, over its whole term: not what was paid.
Extension et restructuration de l’espace citoyen et culturel2024 · maximum over 18 months · at most ~€35k a year on average · Simplified procedure€52kMenuiseries extérieures aluminiumExtension et restructuration de l’espace citoyen et culturel · 2024 · maximum over 18 months · at most ~€26k a year on average · Simplified procedure€39kElsewhere in France
Lift Face holds contracts in 2 towns, worth €186k at award.