The public contracts of Thuir
Up to €5.2M: the maximum amount of the public contracts signed in 2025, over their whole term.
11 contracts in 2025 · €14.3M published from 2019 to 2026. Maximum amounts planned.
Contracts state a maximum amount for their whole term, often several years. That amount differs from what was paid.
Contracts signed by year
Click a year to see its contracts
Purchases by category, 2019–2026
Click a category to see its contracts
The 3 other categories
Main contracts of 2025
Click a contract to see its fiche
- Accord-cadre de travaux de voirieIpf 13 · 2 holders, whole-contract amount · framework agreement: a maximum envelope, not spendingup to €3.9M
- Terrassement, démolition et charpenteMidi Travaux · 2 holders, whole-contract amountup to €243k
- Gros œuvreAthaner Bâtiment Renovation (Abr Bâtiment - Piscine)up to €238k
- Maîtrise d’œuvre des travaux de voirieBertrand Ingenierie Gestion · 3 holders, whole-contract amount · framework agreement: a maximum envelope, not spendingup to €200k
- Mise en sécurité d’un bâtimentAthaner Bâtiment Renovation (Abr Bâtiment - Piscine)up to €197k
- Ouvrage hyfrauliqueRue de la riberette · Poste pm · Farines TPup to €99k
- Garages police municipalePimentel BTPup to €93k
- Charpente métalliqueSARL Thuir Ferronnerieup to €78k
- Pose réseau btParc palauda · Ag BTPup to €68k
- VidéoprotectionPyrenees Sécurité Systemup to €63k
The 1 other contracts of 2025
Main suppliers, 2019–2026
Click a company to see its contracts
- Ipf 133 contractsup to €4.5M
- Association Joseph Sauvy (ESAT la Roseliere - Commercial)2 contractsup to €1M
- Mediterranee Environnement1 contractup to €860k
- Aattac Services SARL1 contractup to €500k
- Ste d'Entretien et de Restauration du Patrimoine et de l'Environnement1 contractup to €500k
- Pompes Funebres Marbrerie Massuet (Atelier Massuet)2 contractsup to €491k
- Midi Travaux2 contractsup to €486k
- Climatisation et Chauffage Ibanez1 contractup to €451k
The 38 other suppliers
- Athaner Bâtiment Renovation (Abr Bâtiment - Piscine)2 contractsup to €435k
- Farines TP3 contractsup to €426k
- BC Interieur1 contractup to €400k
- Carrelages Sanitaires Ferrand2 contractsup to €360k
- Pimentel BTP2 contractsup to €342k
- CO.RE.BAT1 contractup to €251k
- Etude Conception Realisation d'Installations Techniques1 contractup to €219k
- Bertrand Ingenierie Gestion1 contractup to €200k
- Alu Reference1 contractup to €170k
- Structures Metalliques Quintana1 contractup to €162k
- Pyrenees Sécurité System2 contractsup to €147k
- Menuiseries Massuet Denis Place2 contractsup to €142k
- Conforalu1 contractup to €141k
- Grabalosa SARL1 contractup to €139k
- Axair2 contractsup to €128k
- Attraptemps (Attrap'Temps)1 contractup to €127k
- Ag BTP2 contractsup to €121k
- Electronic Connect System (Ecs)1 contractup to €120k
- Encre Verte1 contractup to €120k
- Société Nouvelle d Électricité1 contractup to €113k
- Clim Énergie Concept1 contractup to €113k
- Isobat2 contractsup to €107k
- Ets Baures-Produits Metallurgiques2 contractsup to €90k
- Cegelec Mediterranee1 contractup to €81k
- SARL d'Architecture Cabinet Querol1 contractup to €80k
- SARL Thuir Ferronnerie1 contractup to €78k
- Sele1 contractup to €74k
- Languedoc TP Services1 contractup to €74k
- SARL Da Costa1 contractup to €70k
- Les Clotures du Midi1 contractup to €65k
- Entreprise Générale de Peinture1 contractup to €59k
- Camar1 contractup to €51k
- Medrano Roques1 contractup to €50k
- Constructions Mecaniques Automat Rivard1 contractup to €47k
- Atelier Electrotechnique Atel SARL1 contractup to €46k
- G.K. Professional (GK Pro Uniform)1 contractup to €45k
- Erm Automatismes Industriels1 contractup to €45k
- Etude Realisation Industriel Acoustique1 contractup to €42k
Understanding these figures
What does a contract’s amount measure?
A contract’s amount is the maximum allowed over its whole term, often several years: it is not what the town spends in the year. The lots of one contract are grouped.
Where do these figures come from?
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.
Source: Public procurement — DECP (data.gouv.fr) ↗, consolidated and checked by Colin Maudry (colibre.fr ↗)