Skip to main content

Public contracts of Toulouse · 2022 · Construction and buildings

Travaux de construction d’un nouveau groupe scolaire de saint simon

Lots 4-6-13 et 17

€312k
maximum contract amount over 16 months — what was paid on it is not published
Signed on 2 August 2022 · ended around December 2023 · 16 months

That is at most ~€234k a year on average: a maximum too.

Company selected

Soprema EntreprisesTravaux d'étanchéification · registered office Strasbourg (67100) · headcount 2,000 to 4,999 employees · SIREN 485197552

Number 160 by amount of the 373 contracts Toulouse published for 2022. It belongs to the policy Schools.

Other contracts of Soprema Entreprises in Toulouse

Travaux de construction d’un équipement mutualisé…2026 · maximum over 2 years590€kTravaux de construction d’un équipement mutualisé…2026 · maximum over 2 years511€kTravaux pour la construction du groupe scolaire Daste daubié2023 · maximum over 12 months304€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.