Supplier of Tournon-sur-Rhône · Construction and buildings
Msavel Maconnerie
Msavel Maconnerie holds 3 public contracts awarded by Tournon-sur-Rhône between 2023 and 2026. That is 4% of the value of the contracts the town awarded over the period.
head office in Bozas (07) · 20 to 49 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 347746547
Its contracts in Tournon-sur-Rhône
Maximum amount of each contract, over its whole term: not what was paid.
Travaux de mise en accessibilité de l’hôtel de ville de…2026 · maximum over 6 months · Simplified procedure€180kMise en accessibilité de l’hôtel de ville : démolition, gros œuvre…2025 · maximum over 10 months · Simplified procedure€187kExtension et rénovation de l’école des Luettes2023 · maximum over 19 months · at most ~€216k a year on average · 2 holders, whole-contract amount · Simplified procedure€341kYear by year
€€341k in 2023 · €€180k in 2026
Click a year to see its amount.
Regions, départements, intercommunalities
Msavel Maconnerie holds contracts awarded by 3 of these bodies, worth €3.2M.
Elsewhere in France
Msavel Maconnerie holds contracts in 8 towns, worth €3.2M at award.