Public contracts of Tracy-le-Mont · 2021 · Construction and buildings

Travaux d’extension et de réhabilitation du centre socio-culturel Victor de l’Aigle et amélioration acoustique de la salle Jules Ferry

€90k
maximum contract amount over 15 months — what was paid on it is not published
Signed on 30 March 2021 · ended around June 2022 · 15 months

That is at most ~€72k a year on average: a maximum too.

Who won it

Odent Developpements Holding (Vasseur Godot-Boilloz Carbonnel)Travaux de peinture et vitrerie · registered office Crepy-En-Valois (60800) · headcount 0 employees · SIREN 422362426

A contract awarded to 2 holders; above, the main holder. With it: Prizzon Carrelages. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 7 by amount of the 15 contracts Tracy-le-Mont published for 2021.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.