Public contracts of Trégastel · 2024 · Construction and buildings
Réhabilitation et extension de la base nautique
That is at most ~€835k a year on average: a maximum too.
Who won it
Lachiver BâtimentTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Gurunhuel (22390) · headcount 6 to 9 employees · SIREN 308648518A contract awarded to 3 holders; above, the main holder. With it: Actuel TP, CP Desamiantage. The amount is the whole contract’s: the DECP does not publish each holder’s share.
The largest of the 16 contracts Trégastel published for 2024.
Contract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Forfaitaire
Published amendments : 2
The 2 lots : 810 €k · 164 €k
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.