Skip to main content

Public contracts of Trois-Rivières · 2024 · Construction and buildings

Maîtrise d’oeuvre pour les travaux de requalification et renaturalisation du centre bourg de Trois-Rivières

€118k
maximum contract amount over 3.5 years — what was paid on it is not published
Signed on 5 April 2024 · running until about September 2027 · 3.5 yrs
Ongoing5 Sept 2027

That is at most ~€34k a year on average: a maximum too.

Who won it

TropismeIngénierie, études techniques · registered office Le Gosier (97190) · headcount 1 or 2 employees · SIREN 380176164

A contract awarded to a consortium of 2 holders; above, the main holder. With it: Caribeenne de Coordination et d'Études Techniques. The amount is the whole contract’s: the DECP does not publish each holder’s share.

The competition

1 bid received

Median for this procedure in 2024: 3 bids, across 48385 comparable contracts. Simplified procedure · awarded to 2 companies

Open data publishes the winner and the bid count — never the identity of unsuccessful bidders.

Number 6 by amount of the 16 contracts Trois-Rivières published for 2024.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.