Supplier of Valbonne · Construction and buildings
Sogitec - Taa (Groupe Taa)
Sogitec - Taa (Groupe Taa) holds 5 public contracts awarded by Valbonne between 2024 and 2025. That is 1% of the value of the contracts the town awarded over the period.
head office in Saint Laurent Du Var (06) · 3 to 5 employees · Travaux d'installation d'équipements thermiques et de climatisation · SIREN 807787015
Its contracts in Valbonne
Maximum amount of each contract, over its whole term: not what was paid.
Chauffage, ventilation, climatisation et plomberie2025 · maximum over 18 months · at most ~€107k a year on average · Simplified procedure€161kChauffage, ventilation, climatisationPlomberie · Travaux de réhabilitation de l’abbaye chalaisienne… · 2025 · maximum over 18 months · at most ~€107k a year on average · Simplified procedure€161kTravaux de rénovation du bâtiment de la Poste sur la commune de ValbonnePB/chauffage, ventilation, climatisation · 2025 · maximum over 10 months · Simplified procedure€39kPlomberieChauffage, ventilation, climatisation · Travaux d’aménagement… · 2024 · maximum over 5 months · Simplified procedure€75kPlomberie, chauffage, ventilation, climatisation2024 · maximum over 6 months · Simplified procedure€69kYear by year
Regions, départements, intercommunalities
Sogitec - Taa (Groupe Taa) holds contracts awarded by 3 of these bodies, worth €1.8M.
Elsewhere in France
Sogitec - Taa (Groupe Taa) holds contracts in 8 towns, worth €2.2M at award.