Public contracts of Vaujany · 2023 · Construction and buildings
Travaux rénovation centre accueil de loisir avec herbergement le flumet
Démolition
That is at most ~€67k a year on average: a maximum too.
Who won it
Vision ConstructionTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Grenoble (38100) · headcount 20 to 49 employees · SIREN 849764642Number 45 by amount of the 59 contracts Vaujany published for 2023.
Other contracts of Vision Construction in Vaujany
Rénovation du centre d’accueil de loisir avec hébergement Le Flumet à…2023 · maximum over 15 months74€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Révisable
Published amendments : 1
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.