Skip to main content

Public contracts of Vaulx-en-Velin · 2019 · Construction and buildings

Restructuration et extension du rez-de-chaussée de l’hôtel de ville

€75k
maximum contract amount over 8 months — what was paid on it is not published
Signed on 6 September 2019 · ended around May 2020 · 8 months

Company selected

Metalleries du Forez - Établissements Blanchet (Blanchet Groupe)Travaux de menuiserie métallique et serrurerie · registered office Montbrison (42600) · headcount 100 to 199 employees · SIREN 300795960

Number 72 by amount of the 98 contracts Vaulx-en-Velin published for 2019. It belongs to the policy Streets and transport.

Other contracts of Metalleries du Forez - Établissements Blanchet (Blanchet Groupe) in Vaulx-en-Velin

Restructuration et extension du rez-de-chaussée de l’hôtel de ville2019 · maximum over 8 months228€kRestructuration du RDC de l’Hôtel de Ville2019 · maximum over 8 months80€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.